Project
Angle was asked to assist Wagner’s engineering team on the development of Wellcamp’s Quarry Crushing Plant. The site has a long term quarrying schedule for extraction of road base and other construction materials.
Angle provided
An understanding of construction options
Engineering knowledge
Past experience with working with key personnel in the Wagner group
Ability to develop 3-dimensional models to setout the site, allowing construction to commence in sections whilst other areas where developed further
Ability to identify and solve problems in complex projects.
Considerations of retaining walls up to 9m tall
Design of haul truck access route
Suitable drawings that worked in with other suppliers independently whilst interfacing with the surveyor for setout.